Kitchen Remodeling in Fort Myers, FL

Quick answer: Miniopolis LLC remodels kitchens in Fort Myers and Lee County, from cabinet and countertop updates to full layout changes with new plumbing, electrical and islands. Nationally, a midrange minor kitchen remodel averaged about $28,500 and a midrange major remodel about $81,000 in 2025. Kitchen remodels that move plumbing or electrical need a permit, which we handle.

Last updated: November 2026 · Miniopolis LLC, Florida State Certified General Contractor (CGC1531810), Fort Myers

What We Do

  • Layout changes: open up walls, add an island, move the sink or range.
  • Cabinets and countertops: quartz, granite and solid surface.
  • Plumbing and electrical: new circuits, lighting, gas or induction.
  • Flooring, backsplash and lighting.
  • Moisture-smart materials for Florida humidity and flood-resilient choices on lower levels.

Typical Costs

Project (2025 national averages) Typical cost
Minor kitchen remodel, midrange About $28,500
Major kitchen remodel, midrange About $81,000
Major kitchen remodel, upscale About $161,000

Your price depends on size, layout changes and finishes. We price from your actual kitchen.

Permits

Moving walls, plumbing or electrical requires a building permit from the City of Fort Myers or Lee County. Replacing cabinets and counters in place is often simpler. In a flood zone, keep the 50% rule in mind if the kitchen is part of a larger renovation.

Timeline

A kitchen remodel usually runs several weeks of construction once permits and materials are in, longer for layout changes or custom cabinets.

Related: bathroom remodeling, whole-home renovations and all Fort Myers services.

Request a Free Estimate

Tell us about your project and we will get back to you within one business day, or call (239) 329-8804.

Kitchen Remodeling FAQ

How much does a kitchen remodel cost in Fort Myers?

It depends on scope. As national benchmarks for 2025, a midrange minor remodel averaged about $28,500 and a midrange major remodel about $81,000.

Do I need a permit for a kitchen remodel?

If you move walls, plumbing or electrical, yes. Like-for-like cabinet and counter replacement is usually simpler.

How long does a kitchen remodel take?

Usually several weeks of construction after permits and materials, longer for layout changes.

Sources

Scroll to Top

Connect with us

(239) 329 -8804

Sales@miniopolisbuilders.com

Receive the latest news

Please, enter your email to join our newsletter.